Prevent improper installation of the unit.
Square d bus duct installation manual.
The installation ofi line ii busway.
Iline 2 copper 3 wire plugin feeder style bus duct.
800amp 5000amp copper plug in feeder style 3 wire 480 600v takes pq style bus plugs.
Read and understand this bulletin completely before performing the installation operation and.
Correct bus duct installation and assembly for square d can ensure trouble free service and save you costly downtime.
In this video we look at installing a 3000 amp bus duct manufactured by general electric.
Bus ducts are essential for ensuring an electrical system functions correctly.
Importance of a proper bus duct installation.
If after reviewing this handbook there are still questions which have not been answered your square d field representative and product specialists will be pleased to lend their assistance.
This bulletin contains instructions for the installation operation and maintenance of square d brand i line pbq fusible switch plug in units rated from 400 600 a ip54 and manufactured by schneider electric.
Today square d manufactures everything from electrical switches to bus ducts.
The purchaser s engineering installation and operating staff supervisors should familiarize.
As one of the major brands of schneider electric square d has acquired worldwide recognition in a variety of busway applications.
Introduction this bulletin contains instructions for the handling storage installation operation and maintenance of i line indoor plug in busway equipment 225 600 a manufactured by schneider electric.
Bus duct manual attached you will find the first three issues of the new bus duct manual.
The bus plug ground stabs are designed to ensure positive contact with both the integral and optional internal busway grounds before the bus plug fingers.
I line busbar trunking system is designed with maximum flexibility ease of installation and electrical efficiency in the distribution of power.
This table is showing archived information from prior to march 2018.
Refer to paragraph for bus duct testing procedures during installation.
This manual will be divided into several sections each section pertaining to a specific line of bus duct com plete with all of the dimensions voltage drop curves and characteristics.
Guide stabs prevent installing the bus plug 180 degrees out of rotation.
When bus duct connections incorporate a visual method of proper bolt tightening such as square d company s visi tite double headed bolts contractor shall ensure that field representative witnesses bolt head and warning tag break off per manufacturer s designs.
Before installing any bus duct please read the literature sup.
In addition the stabs provide vertical support for vertical applications.